Javier Carrasco Milara, Cerco San Teodoro, s/n. Almadén (Ciudad Real)
Ownership
Public
Institution
Minas de Almadén y Arrayanes, S.A
Local / Original ID Number
001.001.003.0187
Type of Object
Mine, Transport - shafts
Description
Short description
"It is a tunnel 355 metres long and with a cross-section of 3.10×4.30m2, completely lined with concrete and internally electrified.
It runs internally along the Cerco de San Teodoro between the eponymous shaft and the Cerco de Buitrones. It was used to transport ore from the hopper installed on the surface next to the shaft to the metallurgy feed hoppers in Buitrones, with a depth of 16m from the surface
"
Measures
355m long with a cross-section of 13m2
Materials
Concrete
Dating
1971
Author / Producer
Minas de Almadén
Illustrations
Original use
Transport of ore from the Cerco San Teodoro to the Cerco de Destilación
Present use
Exit for mine visitors, leading outside
Original location
Cerco San Teodoro and Cerco de Destilación
Present location
Cerco San Teodoro and Cerco de Destilación (Mining Park)
STATE OF CONSERVATION
History of conservation:
Present state
good
Necessary activities:
DOCUMENTATION
Addresses /collections/links etc. where further in-depth information is accessible: